Facade Remediation - Building Safety Act

At Bradam our team are specialists with proven expertise in façade remediation works carried out under the Building Safety Act and associated regulations. We support building owners, managing agents, and dutyholders in identifying, designing, and delivering compliant remediation strategies for at-risk buildings. From post-FRAEW investigations to full system replacement, our team brings practical experience, technical rigour, and a safety-first mindset to every project. We work closely with fire engineers, building control, and the Building Safety Regulator to ensure robust and compliant design solutions, resulting in projects that are delivered to the highest standards—safely, compliantly, and without compromise.

 

EWS1 Support & Sign-Off

 

We provide full support in obtaining and evidencing EWS1 forms, supplying the necessary construction detail, product data, and photographic records to assist qualified professionals in issuing forms accurately and with confidence.
 

FRAEW Post Survey Technical Investigations

 

Following a Fire Risk Appraisal of External Walls (FRAEW), we carry out detailed site investigations and sampling to establish construction build-ups, material types, and fire performance risks. This supports the developement of a comprehensive design solution and remediation strategy.
 

Full System Removal & Replacement

 

We deliver safe and efficient removal of unsafe or non-compliant cladding, insulation, and support systems—followed by the installation of fully compliant, high-performance façade systems. All works are carried out with consideration for occupied buildings, minimising disruption and ensuring ongoing safety.
 

Golden Thread Compliant & Information Management 

 

We maintain the golden thread of information from pre-construction through to project completion, providing traceable, accurate records of all works undertaken. This includes detailed photographic documentation, inspection records, product data, and certification to support final sign-off and compliance reporting.
 

Resident Liaison & Communication

 

At Bradam, we recognise that successful façade remediation is not only about technical delivery, but also about the people living and working in the buildings we improve. We are committed to maintaining regular open, transparent, and respectful communication with residents from the earliest stages of a project through to final completion.

Safe, Trusted Delivery


 Safety is central to our delivery model. We are experienced in working in live environments and with vulnerable occupants, applying rigorous health and safety controls, clear communication strategies, and phased delivery methods to protect both people and property throughout the works.
 

HRB & Non-HRB Remediation

 

Our team is experienced in delivering façade remediation across both Higher-Risk Buildings (HRBs) and non-HRBs. We understand the different requirements, reporting duties, and approval pathways for each, ensuring that the right procedures are followed and no time is lost.
 

Quality Assurance & On-site monitoring

 

We implement stringent quality control throughout the construction phase, including detailed Inspection & Test Plans (ITPs), hold-point checks, and installation monitoring. Our approach ensures that all elements of the remediation meet the intended design, manufacturer specifications, and Building Safety Regulator expectations.
 

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.